Perusahaan Oil&Gas MPH Global Buka Lowongan Kerja untuk Posisi Lead of Site Project Engineering

- 4 Januari 2023, 09:10 WIB
SEORANG pekerja sedang melakukan pengecekan instalasi pipa minyak
SEORANG pekerja sedang melakukan pengecekan instalasi pipa minyak /F. MPH OIL&GAS

KEPRI POST - MPH Global, perusahaan internasional yang bergerak di bidang oil&gas saat ini sedang membuka lowongan kerja untuk posisi lead of site project engineering. Bagi yang ingin melamar posisi tersebut, berikut syarat dan deskripsi kerjanya:

Posisi: Lead of Site Project Engineering.

Job Description:

International Oil&Gas Company is looking for a Lead of Site Project Engineering

Job Location: Batam
Contract Term in Months: 36 Months (Till 31 Dec 2025)
Start Date: As soon as possible
Working Schedule
Work hours per day: 10 hrs./day
Workdays per Week: 6 days/week
Workday per Month: 26 days/month

Qualifications:

. Engineering Degree preferably.
15yrs experience in Design, fabrication, construction and commissioning within the offshore oil and gas industry.
. Minimum 12yrs experience with Offshore Facilities (particularly wellhead platform and production platform construction) design, procurement, fabrication, construction & commissioning work phases.
. Minimum 10yrs experience in fabrication yards, preferably SE Asia or Middle Eastern fabrication / construction yards.
. Minimum 10yrs experience as Delivery Engineer or Project Engineer, preferably at Senior or Lead level.
. Knowledge of Industry standards

Job Highlights:

. Assist the Head of Topsides Execution with the delivery of the NFXP Offshore Topsides at Batam Fabrication yard.
. Ensure the objectives for the fabrication of the NFXP Offshore Topsides are safely met as per applicable HSE&S, quality standards and Project Specifications, and within the approved budget and schedule.
. Assist in the implementation and compliance of the EPCI scope(s) of work and key milestones, but mainly responsible for monitoring and expediting the Procurement and Subcontracts delivery in accordance with the fabrication ROS dates and schedule critical path, ensuring key control, management of change and systems completion processes are implemented on the yard, assisting the CSR with reporting and risk management.

Halaman:

Editor: Romi Kurniawan


Tags

Artikel Pilihan

Terkini

Terpopuler

Kabar Daerah